In 1900 August Belmont, Jr. and Andrew Onderdonk embarked on
a massive project that would change the lives of New Yorkers forever.
Their Rapid Transit Construction Company (reorganized as the Interborough Rapid
Transit Company in May 1902) obtained the rights to build an underground
railroad system—Manhattan’s first subway.
Simultaneously, the Manhattan Railway Company was erecting
elevated trains along Sixth and Ninth Avenues.
New Yorkers would soon enjoy modern, electrified mass transportation—the 20th century had arrived.
But the trains that would run along the elevated and
subterranean tracks would need electricity to power them along. Powerhouses and substations with colossal
generators had to be constructed. And
that meant that old buildings—entire blocks in the case of powerhouses—would have
to go.
In 1901 the Manhattan Railway Company documented both the front and rear of Nos. 173 and 175 Spring Streets. The last tenant in No. 173 peers out the second floor window (bottom). from the collection of the Museum of the City of New York |
James Holden sold crockery from No. 173 around the time that Albert Schwab made embroideries in the building. |
By the 1890s space in the house next door, at No. 173, was being used
as the embroidery-making shop of Albert Schwab.
Albert found himself in trouble in 1894 when Augusta De Barenne, “a
young French woman,” accused him of being annoying.
Schwab had left his wife in 1883 and come to New
York from France with his two children. Then in
April of 1894 he met Augusta. He
proposed to her, she accepted, and he gave her $100 for a trousseau. Instead, she spent the money “in fitting up a
flat for herself.” Then she broke off
the engagement.
When Schwab wrote her a letter demanding his money back, she
had him arrested for annoyance. The
judge agreed to dismiss the case if Schwab would “let the money go.”
As Schwab licked his romantic wounds, the old three-story
houses at Nos. 173 and 175 Spring Street were about to fall victim to the 20th
century. In July 1901 George H. Pegram
filed plans for the Manhattan Railway Company for three “electric power house
sub-stations for its Sixth and Ninth Avenue elevated lines,” as reported in The
New York Times on July 31.
“The sub-stations are to be used to transform the electric
current generated at the company’s main power house at Seventy-fourth Street
and the East River,” explained the newspaper.
Among the three projected structures was a “four-story brick sub-station
at 173 to 175 Spring Street.”
George H. Pegram was more engineer than architect. As Chief Engineer of the Metropolitan Railway
Company, he was responsible for efficient operation of the massive facilities and machines. A few months earlier, in
January 1901, the Street Railway Journal noted “The plans of these buildings,
as worked out by George H. Pegram…and his corps of able assistants, will
undoubtedly produce buildings that will serve as models in sub-station construction.”
The Manhattan Railway Company carefully documented every stage of the construction process. photo by the Manhattan Railway Company, from the collection of the Museum of the City of New York |
It is most likely Pegram’s engineer-first, architect-second
status that resulted in the style of Sub Power Station 2 being
about a decade late to the architectural party. The
beefy Romanesque Revival base of rough-cut stone blocks had passed from style
by now—prompting many current-day architectural historians to erroneously place
it in the 19th century. Above, three stories of brick were punctured
by regimented rows of square openings and capped by an understated cornice. It was a pleasing and attractive face for an undisputedly
utilitarian structure.
In 1903 the Interborough Rapid Transit Company leased the
Manhattan Railway Company, at which time their power systems were joined. The City Real Estate Company was formed to
take over the former Manhattan Railway properties. Among those transferred to the City Real
Estate Company on March 18, 1903 was the Substation 2 on Spring Street. It was good news for the structure. With the consolidation of electrical
supplies, some of Manhattan Railway Company’s substations were no longer needed
and were demolished.
A year after construction began, Substation 2 was nearly complete. photo by the Manhattan Railway Company, from the collection of the Museum of the City of New York |
As long as the Sixth Avenue elevated train existed, Substation
2 would survive. An assessment of the
properties of the Manhattan Railway Company in January 1907 placed the value of
Substation 2 at $5,500—a mere $143,000 in today’s dollars.
Substation 2 house massive machinery in vast open areas. photo by the Manhattan Railway Company, from the collection of the Museum of the City of New York |
During the Great Depression merchants and property owners
along Sixth Avenues continually complained to the city about the elevated
train. The tracks cast the avenue in
perpetual shadow and the noise and vibrations of the passing trains lowered
property values. In response the first stage
of the Sixth Avenue subway line was opened in 1936.
In 1938, as the subway
construction continued (it would be fully opened in 1940), the City of New York
purchased the Sixth Avenue Elevated from the Manhattan Railway Company’s
bondholders for $12.5 million. The El
was closed on December 4, 1938 and demolished within the year.
With the Sixth Avenue El gone, Substation 2 had no
purpose. The arduous task of dismantling
and removing the goliath equipment inside was undertaken, and the cavernous
structure was recycled for business purposes.
In 1964 it was converted to a lumber store on the first floor and
mezzanine. Department of Buildings
records noted that the upper floors were “to remain vacant.”
The Gem Lumber Company would play a role in a tragedy that
would rivet the attention of Americans nationwide in 1979. Six-year old Etan Patz left his Soho home for
school at 8:00 on the morning of Friday, May 25. Every other day he boarded a school bus two
blocks away, at West Broadway and Prince Streets. But that morning he was not there when the
bus pulled up.
Two days later The New York Times reported “However, late
Friday afternoon the boy was in a neighborhood lumber store, according to the
store’s manager.” Howard Belasco told
investigators he noticed Etan and another boy at around 4:30 or 5:00.
“They were outside playing in a dumpster, pulling out scraps
of lumber and then they came here and bought two boxes of nails,” he said. “Then they went around back and took some
more scraps, then they disappeared.”
Belasco identified Etan from the school photograph police were
distributing in the area.
No trace was ever found of Etan Patz and his disappearance
still haunts the minds of New Yorkers.
When Metropolitan Lumber and Hardware moved in, it painted a
Soho-worthy mural on the upper floors.
The bold graphics became a Spring Street landmark. The lumber store left in 2015, leaving the
fate of the building and the mural in question.
photographs by the author
Glad i managed to snap my own shot of this place during out 2015 visit from Australia. I am loving this blog.
ReplyDeleteWonderful that you photographed it. The mural may be endangered. Glad you are enjoying the blog!
Deletethe lumber has not left. It is still there as of Feb 17, 2016
ReplyDeleteMy grandfather owned it before gem ..
DeleteWas called
Downtown lumber
The Elevated trains on 6th and 9th Avenues had opened in 1878 an 1868 respectively. The 3rd Avenue Elevated opened in 1878 and the 2nd Avenue Elevated opened in 1880. These elevated lines were steam-powered until electrification in 1901-03. The 8th Avenue IND subway station at Spring Street opened in September 1932 and the 6th Avenue Subway from West 4th Street station to 53rd Street opened in December 1940, two years after the Elevated had closed. For an all-original color record of the l
ReplyDeleteast years of the Manhattan Elevated (1951-1955), see my book, "By the El, Third Avenue and Its El at Mid-Century." It is available at the New York Transit Museum Shop and the South Street Seaport Museum Shop. Lawrence Stelter, Author-Publisher, 3/27/2024